www.positiveindia.net.in
Horizontal Banner 1

Chandrayaan-2 Will Land On Moon On 16 Sept, 2019.

All modules getting ready for Chandrayaan-2 launch.

Ad 1

Positive India: Chandrayaan-2, India’s second lunar mission,is ready to be launched from 9th July to 16th July-2019.All preparations are ready.It has three modules namely Orbiter, Lander (Vikram) & Rover (Pragyan).
The Orbiter and Lander modules will be interfaced mechanically and stacked together as an integrated module and accommodated inside the GSLV MK-III launch vehicle.
The Rover is housed inside the Lander. After launch into earth bound orbit by GSLV MK-III, the integrated module will reach Moon orbit using Orbiter propulsion module. Subsequently, Lander will separate from the Orbiter and soft land at the predetermined site close to lunar South Pole. Further, the Rover will roll out for carrying out scientific experiments on the lunar surface. Instruments are also mounted on Lander and Orbiter for carrying out scientific experiments.
All the modules are getting ready for Chandrayaan-2 launch during the window of July 09 to July 16, 2019, with an expected Moon landing on September 06, 2019.

Gatiman Ad Inside News Ad
Horizontal Banner 3
Leave A Reply

Your email address will not be published.